Process Planning and Scheduling for Distributed Manufacturing
Guardado en:
Autor Principal: | |
---|---|
Autor Corporativo: | |
Otros Autores: | |
Formato: | Electrónico |
Idioma: | English |
Publicado: |
London :
Springer-Verlag London Limited,
2007.
|
Series: | Springer Series in Advanced Manufacturing,
|
Materias: | |
Acceso en línea: | SpringerLink, via BECYT |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
LEADER | 01079nmm a22003015u 4500 | ||
---|---|---|---|
001 | springer.978-1-84628-751-0 | ||
003 | Springer | ||
005 | 20100326161207.0 | ||
007 | cr#nn#008mamaa | ||
008 | 100301s2007 xx j eng#d | ||
020 | |a 9781846287527 | ||
100 | 1 | |a Wang, Lihui. | |
245 | 1 | 0 | |a Process Planning and Scheduling for Distributed Manufacturing |h [electronic resource] / |c edited by Lihui Wang, Weiming Shen. |
260 | |a London : |b Springer-Verlag London Limited, |c 2007. | ||
300 | |b v.: digital | ||
440 | 0 | |a Springer Series in Advanced Manufacturing, |x 1860-5168 | |
650 | 0 | |a Engineering | |
650 | 0 | |a Computer aided design | |
650 | 0 | |a Industrial engineering | |
650 | 0 | |a Business logistics | |
650 | 1 | 4 | |a Engineering |
650 | 2 | 4 | |a Industrial and Production Engineering |
650 | 2 | 4 | |a Control Engineering |
650 | 2 | 4 | |a Computer-Aided Engineering (CAD, CAE) and Design |
650 | 2 | 4 | |a Production/Logistics |
700 | 1 | |a Shen, Weiming. | |
710 | 2 | |a SpringerLink (Online service) | |
856 | 4 | 0 | |u http://dx.doi.org/10.1007/978-1-84628-752-7 |y SpringerLink, via BECYT |